View and Edit the Labour Forecast Details

After running a labour forecast, you may want to check labour hours and headcount to see if they line up with expectations for jobs and departments at specific times on specific days. You can do this by drilling down to the daily labour forecast.

You can also set up a view to examine the effect of modifying forecasted volume values on labour requirements. Add volume drivers to the forecast factors in the Labour workspace as detailed in Forecast Factors.

To access the detailed views for the jobs in a department, or for a single job:

  1. Select a department location path. (See Select Location
  2. Select a forecast week. (See Select a Forecast Week.)
  3. Select a favourite factor view that includes labour hours, jobs, or both.
  4. To view or edit the breakdown values for a forecast factor, do one of the following:
    • In the Forecast Factors column, click a cell labelled Labour Hours – Forecasted – (any week) to view or edit the forecasted headcounts for all the jobs in that department. See Daily labour forecast by department for details.
    • In the Forecast Factors column, click a Job (any job) to view or edit the forecasted headcount and additional details for that job. See Daily labour forecast by jobfor details.

See the effect of volume changes have on headcounts

  • You can include volume drivers as a forecast factor in the Labour workspace. This can provide an easy way to check the effect of volume changes on labour headcount.
  • Scenario: Having executed both a volume run and a labour run for a department and examined the forecasted headcount for a job, you now want to see what would be the potential impact of a sudden increase in volume on forecasted headcount for that job.

    Note: There is no way to save the complete scenario without losing the original forecast. However Calculate Totals provides a way to see the effect and return to the original forecast.

    1. In the Volume workspace, add a forecast factor to show the forecasted volume driver values for the department.
    2. In the Volume workspace, add a forecast factor to show the forecasted volume driver values for the department.
    3. Double-click a forecasted volume value and make the modification.
    4. Click on Calculate Totals to see the effect on related values in the table, if any. If you want to keep all these values and proceed, click Save . If not, click Refresh .
    5. Run the labour engine:
      1. Click Run Labour. The Run Labour panel opens.
      2. Select the loaded location you want to run. The location must be a site or a department and you must have already have run a labour forecast for the location.
      3. Note that any metrics Measures and tracks workforce performance by comparing planned with actual workload or coverage, or by showing variances at any organizational level. that are used in the constraint are evaluated at run time for the current forecast week.
      4. Click Run.
      5. To check the progress of the volume run, click Tools > Engine Status. The Engine Status panel opens showing active engine runs and their status. To update the engine status, click Refresh .
      6. When the run is over, click OK.
    6. Compare the previous headcount for the job to the current headcount. If you want to keep the new headcount values, click Save . If not, click Refresh and click .
    7. (Optional) If you want to revert the volume forecast to the previous values, click Restore Volume ,